Showing 109–120 of 715 results
Designed for storing monopiece aluminum scaffolding brackets.
171 lb (8’42”)
Designed for storing scaffolding brackets. A single crane operator can place your scaffolding brackets exactly where they’re needed at the jobsite
This bracket is designed for safely stacking panels to create a higher wall.
Designed for storing short fillers and facilitating their retrieval.
This tool is used to easily and quickly break off ties.
Designed for storing your small tools and accessories. A single crane operator can place the accessories exactly where they’re needed at the jobsite’
The square shovel is used for laying concrete.
To comply with height restrictions, the horizontal panel cage can be transported lying down
This tool is used to stack panels. It is attached to the bolts on the panel. It’s use is similar to the strongback waler.
Designed for safely stacking panels to build a higher wall.
Also called “High and Low system”, this system works with 8’ 6 bars and 8’6” 6 bars family of panels.
This universal 24’’ scaffolding bracket can fit on 5 different bolt spacings as shown in the second picture. It attaches on 2 bolts on panel bars.
70 Comsewogue Rd SUITE 9 Setauket-East Setauket, NY 11733 Phone: (631) 928-4665
Navigation
Contact
Proud Members of these Fine Organizations: